Our work

Polymerized tar equipment

The company has installed and established a production line to develop asphalt using additives to obtain the polymeric asphalt product (polymer modified bitumen              The factory is located near Al-Diwaniyah Governorate, and the factory contains a laboratory To examine the developed polymer material, under the supervision of foreign engineers, by the International CompanyRichmond, as the International CompanyRichmond is the primary partner of Al-Sohul Company. In Iraq and accredited by the American University of Utah, the company contracted with the companies of Assyria and Hammurabi. These two companies are one of the formations of the Ministry of Housing and Construction, with contracts numbered:

  • Ashur Company Contract No. (27) dated 3/17/2020.
  • Hammurabi Company Contract No. (9) dated 9/25/2019.
  • The Meadows Factory is accredited by the Ministry of Housing and Construction, the Roads and Bridges Authority, and the Highway Traffic Directorate.

The company’s completed works for polymer clay projects:

  • Implementing and preparing ordinary bitumen (50-40)and converting it into polymerized bitumen in the amount of 8000 tons for the Kut-Baghdad road expansion project from the year 2023-2024
  • Carrying out the work of implementing and preparing ordinary bitumen (50-40)and converting it into polymerized bitumen in the amount of 1000 tons for the North Nasiriyah / Hammurabi Company project in the year 2023
  • Carrying out the work of implementing and preparing ordinary bitumen (50-40) and converting it into polymerized bitumen in the amount of 1492 tons for the Al-Faw port project of the Korean Daewoo company in the year 2022
  • Carrying out the work of implementing and preparing ordinary bitumen (50-40)and converting it into polymerized bitumen in a quantity of 2120 tons for the Ramadi - Haditha Road Project / Hammurabi Company in the year 2021 - 2022
  • Conducting the work of implementing and preparing ordinary bitumen (50-40)and converting it into polymerized bitumen in the amount of 7,500 tons for the highway project / Ashur Company from the year 2021 - 2023
  • Carrying out the work of implementing and preparing ordinary bitumen (50-40) and converting it into polymerized bitumen in the amount of 1000 tons for the Afak project - Al-Badir / Hammurabi Company in the year 2021
  • Carrying out the work of implementing and preparing ordinary bitumen (50-40)and converting it into polymerized bitumen in the amount of 10,000 tons for the Highway Traffic Project (I/6) Hammurabi Company from the year 2019-2023
  • Establishing a specialized laboratory for examining polymerized bitumen and obtaining a certificate of accreditation from the Iraqi Accreditation Authority affiliated with the Iraqi Ministry of Planning, numbered (TL 082) and approved by the Ministry of Planning. Housing and Construction / Roads and Bridges Authority / Highway Traffic Directorate.