The company's civil works:
- The company equipped and installed the (Black Jewel) plant, located in Samawah Governorate, which specializes in refining petroleum derivatives and developing asphalt (polymer modified bitumen)Year 2023
- The company carried out concrete lining works for the Shatt al-Arab irrigation project with the Ministry of Water Resources. The company used two laboratories to produce concrete with all the necessary mechanisms for the lining process
- The company constructed the North Bank building in 2009 at Baghdad Airport with infrastructure including roads, parking, and employee housing, contract number (APO AE 09342).
- /strong>
- The company constructed a gas station with markets and a residential building, as well as roads and parking lots at the Speicher military base.
- The company established a gas station with markets and a residential building, as well as roads and parking lots at Baghdad Airport (comp victory)
- The company (exported) the developed asphalt to the Hashemite Kingdom of Jordan and equipped the Arab-Italian Company for the Manufacture of Insulating Materials, which was founded by the consulting engineer (Helkord Mustafa Al-Jaf), who is the authorized director of the Al-Sohol Trading and General Contracting Company.< /li>
- The consulting engineer (Helkurd Mustafa Al-Jaf) constructed a runway for aircraft at Riyadh Military Airport, affiliated with the Iraqi Air Freedom Base and affiliated with the Iraqi Air Force Works Directorate, in a contract with the Air Force Works Directorate in 1981

